²ÝÁñÊÓÆµ

Temporary

Site Access

Beginning Term 4 in 2023 ²ÝÁñÊÓÆµ will be starting a major construction project to redevelop our Administration Building. To accommodate this redevelopment the process of relocating key functions and staff has begun, starting with our Reception Office and Student Window which is now located in A Block.

This page will be used to update parents and visitors about site access changes throughout Term 4 2023, and then as the construction progresses in 2024. Any changes to student or staff access will be shared with parents, carers and staff to ensure suitable and safe access is maintained to our College and School site at all times.

Please be aware of the following access restrictions for J2 Playground and L Block.

CURRENT ACCESS RESTRICTIONS

J2 Playground

The grass and playground area above J2 has been fenced off from Monday 6 November to allow the removal of the playground equipment and site preparation for the modular classrooms being installed over the Christmas school holidays. Please remain out of this fenced area.


L Block Upstairs

The area previously hosting ICT, Counselling and Enrichment is currently being refurbished to provide fresh new spaces for these departments. From Monday 6 November and for the remainder of Term 4 please do not access this area.

ICT is temporarily located in Tas 4 and the Library (Helpdesk).

Counselling and the Quiet Carriage is temporarily located in Admin with entry via the old Student Window door.

Enrichment are temporarily located in C2 and the Library.

To contact any of the staff from these Departments please call the college Reception on 43631266.